Information about Henry L. Gantt

Henry Laurence Gantt
Born1861
DiedNovember 23, 1919
CitizenshipUnited States
FieldScientific management
Known forGantt chart


Henry Laurence Gantt, A.B., M.E. (1861-23 November 1919) was a mechanical engineer and management consultant who is most famous for developing the Gantt chart in the 1910s. These Gantt charts were employed on major infrastructure projects including the Hoover Dam and Interstate highway system and still are an important tool in project management.[1]

Biography

Gantt was born in Calvert County, Maryland, USA. He graduated from McDonogh School in 1878 and Johns Hopkins College and worked as a teacher and draughtsman before becoming a mechanical engineer. In 1887 he joined Frederick W. Taylor in the scientific management of Midvale Steel and Bethlehem Steel and worked with him there until 1893. In his later career as a management consultant, in addition to the Gantt chart, he also designed the 'task and bonus' system of wage payment and developed methods of measuring worker efficiency and productivity.

Gantt charts

The following discussion of Gantt charts originally appeared in Herrmann (2005):[2]

It is important to note that Gantt created many different types of charts. Moreover, Gantt designed his charts so that foremen or other supervisors could quickly know whether production was on schedule, ahead of schedule, or behind schedule. Modern project management software includes this critical function even now.

Gantt (1903)[3] describes two types of balances: the “man’s record,” which shows what each worker should do and did do, and the daily balance of work, which shows the amount of work to be done and the amount that is done. Gantt gives an example with orders that will require many days to complete. The daily balance has rows for each day and columns for each part or each operation. At the top of each column is the amount needed. The amount entered in the appropriate cell is the number of parts done each day and the cumulative total for that part. Heavy horizontal lines indicate the starting date and the date that the order should be done. According to Gantt, the graphical daily balance is “a method of scheduling and recording work.” In this article, Gantt also describes the use of production cards for assigning work to each operator and recording how much was done each day.

In Work, Wages, and Profits (originally published in 1916),[4] Gantt explicitly discusses scheduling, especially in the job shop environment. He proposes giving to the foreman each day an “order of work” that is an ordered list of jobs to be done that day. Moreover, he discusses the need to coordinate activities to avoid “interferences.” However, he also warns that the most elegant schedules created by planning offices are useless if they are ignored, a situation that he observed.

In Organizing for Work (originally published in 1919),[5] Gantt gives two principles for his charts: one, measure activities by the amount of time needed to complete them; two, the space on the chart can be used the represent the amount of the activity that should have been done in that time. Gantt shows a progress chart that indicates for each month of the year, using a thin horizontal line, the number of items produced during that month. In addition, a thick horizontal line indicates the number of items produced during the year. Each row in the chart corresponds to an order for parts from a specific contractor, and each row indicates the starting month and ending month of the deliveries. It is the closest thing to the Gantt charts typically used today in scheduling systems, though it is at a higher level than machine scheduling.

Gantt’s machine record chart and man record chart are quite similar, though they show both the actual working time for each day and the cumulative working time for a week. Each row of the chart corresponds to an individual machine or operator. These charts do not indicate which tasks were to be done, however.

A novel method of displaying interdependencies of processes to increase visibility of production schedules was invented (and aplicated) in 1896 by Karol Adamiecki and described in "Przeglad Techniczny" No 17, 18, 19 and 20 of 1909. In 1931, Adamiecki published a number of articles popularizing this diagram, which he called the Harmonogram or Harmonograf. With minor modifications, this chart is now more commonly referred to as the Gantt Chart.

Contributions

Henry Gantt's legacy to production management is the following:
  • The Gantt chart: Still accepted as an important management tool today, it provides a graphic schedule for the planning and controlling of work, and recording progress towards stages of a project. The chart has a modern variation, Program Evaluation and Review Technique (PERT).
  • Industrial Efficiency: Industrial efficiency can only be produced by the application of scientific analysis to all aspects of the work in progress. The industrial management role is to improve the system by eliminating chance and accidents.
  • The Task And Bonus System: He linked the bonus paid to managers to how well they taught their employees to improve performance.
  • The social responsibility of business: He believed that businesses have obligations to the welfare of society that they operate in.
The American Society of Mechanical Engineers (ASME) awards an annual medal in honor of Henry Laurence Gantt.[6]

References

1. ^ Gantt chart history Accessed 7 April 2007.
2. ^ Herrmann, Jeffrey W., History of Decision-Making Tools for Production Scheduling, Proceedings of the 2005 Multidisciplinary Conference on Scheduling: Theory and Applications, New York, July 18-21, 2005.
3. ^ Gantt, Henry L., A graphical daily balance in manufacture, Transactions of the American Society of Mechanical Engineers, Volume XXIV, pages 1322-1336, 1903.
4. ^ Gantt, Henry L., Work, Wages, and Profits, second edition, Engineering Magazine Co., New York, 1916. Reprinted by Hive Publishing Company, Easton, Maryland, 1973.
5. ^ Gantt, Henry L., Organizing for Work, Harcourt, Brace, and Howe, New York, 1919. Reprinted by Hive Publishing Company, Easton, Maryland, 1973.
6. ^ ASME Henry Laurence Gantt Medal Accessed 7 April 2007.

See also

Persondata
NAMEGantt, Henry Laurence
ALTERNATIVE NAMES
SHORT DESCRIPTIONAmerican engineer
DATE OF BIRTH1861
PLACE OF BIRTH
DATE OF DEATHNovember 23, 1919
PLACE OF DEATH
18th century - 19th century - 20th century
1830s  1840s  1850s  - 1860s -  1870s  1880s  1890s
1858 1859 1860 - 1861 - 1862 1863 1864

:
Subjects:     Archaeology - Architecture -
..... Click the link for more information.
19th century - 20th century - 21st century
1880s  1890s  1900s  - 1910s -  1920s  1930s  1940s
1916 1917 1918 - 1919 - 1920 1921 1922

Year 1919 (MCMXIX
..... Click the link for more information.
Motto
"In God We Trust"   (since 1956)
"E Pluribus Unum"   ("From Many, One"; Latin, traditional)
Anthem
..... Click the link for more information.
Scientific management, also called Taylorism or the Classical Perspective, is a method in management theory that determines changes to improve labour productivity. The idea was first coined by Frederick Winslow Taylor in The Principles of Scientific Management.
..... Click the link for more information.
Gantt chart is a popular type of bar chart that illustrates a project schedule. Gantt charts illustrate the start and finish dates of the terminal elements and summary elements of a project. Terminal elements and summary elements comprise the work breakdown structure of the project.
..... Click the link for more information.
November 23 is the 1st day of the year (2nd in leap years) in the Gregorian calendar. There are 0 days remaining.

Events

  • 800 - Charlemagne arrives at Rome to examine the alleged crimes of Pope Leo III.

..... Click the link for more information.
19th century - 20th century - 21st century
1880s  1890s  1900s  - 1910s -  1920s  1930s  1940s
1916 1917 1918 - 1919 - 1920 1921 1922

Year 1919 (MCMXIX
..... Click the link for more information.
This is a list of mechanical engineers, notable people who were trained in or practiced mechanical engineering, nuclear engineering, etc. This is not a list of engineers practicing that profession.

See also List of engineers for links to other engineering professions.
..... Click the link for more information.
Management consulting (which comprises strategy consulting and operations consulting) refers to both the practice of helping companies to improve performance through analysis of existing business problems and development of future plans, as well as to the industry
..... Click the link for more information.
Gantt chart is a popular type of bar chart that illustrates a project schedule. Gantt charts illustrate the start and finish dates of the terminal elements and summary elements of a project. Terminal elements and summary elements comprise the work breakdown structure of the project.
..... Click the link for more information.
Centuries: 19th century - 20th century - 21st century

1880s 1890s 1900s - 1910s - 1920s 1930s 1940s
1910 1911 1912 1913 1914
1915 1916 1917 1918 1919

- -
-

Events and trends


..... Click the link for more information.
Hoover Dam

Hoover Dam from the air
Official name Hoover Dam
Impounds Colorado River
Creates Lake Mead
Locale ..... Click the link for more information.
Bethlehem Steel Corporation (1857–2003), based in Bethlehem, Pennsylvania, once was the second largest steel producer in the United States (after Pittsburgh, Pennsylvania-based US Steel).
..... Click the link for more information.
Labour productivity is defined by the OECD to be "the ratio of a volume measure of output to a volume measure of input" OECD Manual: “Measuring Productivity; Measurement of Aggregate and Industry-Level Productivity Growth.
..... Click the link for more information.
A supervisor is an employee of an organization with some of the powers and responsibilities of management, occupying a role between true manager and a regular employee. A Supervisor position is typically the first step towards being promoted into a management role.
..... Click the link for more information.
Scheduling is an important tool for manufacturing and engineering, where it can have a major impact on the productivity of a process. In manufacturing, the purpose of scheduling is to minimize the production time and costs, by telling a production facility what to make, when, with
..... Click the link for more information.
Karol Adamiecki (b. March 18, 1866 in Dąbrowa Górnicza - May 16, 1933 in Warsaw, Poland) was a Polish economist, engineer and management researcher. Professor of Politechnika Warszawska. Founder and first director (1925-1933) of Instytut Naukowej Organizacji in Warsaw.
..... Click the link for more information.
Program (or Project) Evaluation and Review Technique, commonly abbreviated PERT, is a model for project management designed to analyze and represent the tasks involved in completing a given project.
..... Click the link for more information.
American Society of Mechanical Engineers (A.S.M.E) is a professional body, specifically an engineering society, focused on mechanical engineering. The ASME was founded in 1880 by Alexander Lyman Holley, Henry Rossiter Worthington, John Edison Sweet and Matthias N.
..... Click the link for more information.
The Henry Laurence Gantt Medal was established in 1929 by the American Society of Mechanical Engineers for "distinguished achievement in management and service to the community.
..... Click the link for more information.
Scheduling may refer to:
  • I/O scheduling, the order in which I/O requests are submitted to a block device in Computer Operating Systems
  • Scheduling (broadcasting), the minute planning of the content of a radio or television broadcast channel

..... Click the link for more information.
See also The Human Factor (disambiguation).


"Human Factors" (HF) is a catch-all term that covers;
  • The science of understanding the properties of human capability (Human Factors Science).

..... Click the link for more information.
Karol Adamiecki (b. March 18, 1866 in Dąbrowa Górnicza - May 16, 1933 in Warsaw, Poland) was a Polish economist, engineer and management researcher. Professor of Politechnika Warszawska. Founder and first director (1925-1933) of Instytut Naukowej Organizacji in Warsaw.
..... Click the link for more information.
18th century - 19th century - 20th century
1830s  1840s  1850s  - 1860s -  1870s  1880s  1890s
1858 1859 1860 - 1861 - 1862 1863 1864

:
Subjects:     Archaeology - Architecture -
..... Click the link for more information.
19th century - 20th century - 21st century
1880s  1890s  1900s  - 1910s -  1920s  1930s  1940s
1916 1917 1918 - 1919 - 1920 1921 1922

Year 1919 (MCMXIX
..... Click the link for more information.


This article is copied from an article on Wikipedia.org - the free encyclopedia created and edited by online user community. The text was not checked or edited by anyone on our staff. Although the vast majority of the wikipedia encyclopedia articles provide accurate and timely information please do not assume the accuracy of any particular article. This article is distributed under the terms of GNU Free Documentation License.
Herod_Archelaus


page counter